{"_gated":true,"_hidden_count":2,"_preview_only":true,"_required_tier":"IDENTIFIED","_signup_url":"https://dchub.cloud/signup","_total_available":5,"_upgrade_cta":"Showing 3 of 5 grid regions. Get all 5 (queue GW, corridor count, key states, status) free \u2014 POST /api/v1/keys/claim or pass X-API-Key.","regions":[{"corridor_count":5,"description":"255 GW of data center requests in Oncor territory alone \u2014 8x system peak. Severe dilution expected under Batch Zero. South Texas and the Plains offer unconstrained alternatives.","headline":"Batch Zero: The Transmission Reckoning","id":"ercot","iso":"ERCOT","key_states":["TX"],"name":"ERCOT \u2014 Texas","page_url":"/research/ercot-batch-zero","status":"live","total_queue_gw":293.0},{"_queue_gw_source":"estimate","corridor_count":6,"description":"Northern Virginia hosts 70%+ of US hyperscale capacity. PJM Cycle 1 launches 2026 with reformed interconnection. Ohio, Indiana, and West Virginia emerge as overflow markets with lower capacity prices.","headline":"Data Center Alley: 30 GW and Counting","id":"pjm","iso":"PJM","key_states":["VA","OH","IN","WV","PA","NJ","MD"],"name":"PJM \u2014 Mid-Atlantic & Ohio Valley","page_url":"/research/grid-intelligence/pjm","status":"live","total_queue_gw":30.0},{"_queue_gw_source":"estimate","corridor_count":5,"description":"MISO South and SPP absorb developers priced out of Texas and PJM. Abundant wind + gas, low land costs, and growing transmission capacity make these the next frontier.","headline":"The Quiet Winners Catching ERCOT Overflow","id":"miso-spp","iso":"MISO / SPP","key_states":["OK","KS","MS","LA","AR","IA","NE","MO"],"name":"MISO & SPP \u2014 Central US","page_url":"/research/grid-intelligence/miso-spp","status":"live","total_queue_gw":25.0}],"source":"DC Hub Grid Intelligence","success":true,"total":3}
