{"as_of":"2026-08-16","by_iso":[{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"NESO","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":53.7,"queued_load_dc_share_pct":8.9,"queued_load_total_gw":604.5,"source_name":"UK NESO TEC Register (active connections queue, per-project MW)","source_url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"ERCOT","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":225.0,"queued_load_dc_share_pct":null,"queued_load_total_gw":440.3,"source_name":"ERCOT GIS Report (July2026, active generation queue)","source_url":"https://www.ercot.com/misdownload/servlets/mirDownload?doclookupId=1258020955","top_subregions":[{"approved_to_energize_gw":9.0,"as_of":"2026-Q1","basis":"cited: ERCOT Q1-2026 TAC Large Load update","in_process_gw":225.0,"name":"Large-load (data-center-driven) interconnection queue","note":"ERCOT large-load (>=75 MW) interconnection queue, predominantly data centers \u2014 DISTINCT from the generation queue (queued_load_total_gw); not a share of generation.","source_url":"https://www.ercot.com/services/rq/large-load-integration"}],"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"MISO","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw":220.0,"source_name":"MISO GI Queue API (applicationStatus=Active, summer MW)","source_url":"https://www.misoenergy.org/api/giqueue/getprojects","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"SPP","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw":187.6,"source_name":"SPP GI active requests (MAX Summer MW, excl. cessation)","source_url":"https://opsportal.spp.org/Studies/GenerateActiveCsv","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"PJM","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw":171.0,"source_name":"PJM New Services Queue (active, sum of MFO)","source_url":"https://services.pjm.com/PJMPlanningApi/api/Queue/ExportToXls","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"CAISO","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw":75.7,"source_name":"CAISO Public Queue Report (Application Status=ACTIVE, Net MWs to Grid)","source_url":"https://www.caiso.com/PublishedDocuments/PublicQueueReport.xlsx","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"AESO","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":18.6,"queued_load_dc_share_pct":73.7,"queued_load_total_gw":25.2,"source_name":"Alberta AESO Connection Project List (active; August-2026-Project-List.xlsx)","source_url":"https://www.aeso.ca/grid/connecting-to-the-grid/connection-project-reporting/","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"IESO","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":10.2,"queued_load_dc_share_pct":60.4,"queued_load_total_gw":16.9,"source_name":"Ontario IESO CAA connection queue (active, summer MW)","source_url":"https://www.ieso.ca/en/Get-Involved/Connection-Assessments/Connection-Application-Status","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"ISO-NE","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw":14.4,"source_name":"ISO-NE IRTT Public Queue (active, Summer MW)","source_url":"https://irtt.iso-ne.com/reports/external","top_subregions":null,"v":"published"},{"as_of":"2026-08-16","historical_completion_pct":null,"iso":"NYISO","new_applications_period":null,"new_applications_q_gw":null,"queued_load_data_center_gw":null,"queued_load_dc_share_pct":null,"queued_load_total_gw":10.3,"source_name":"NYISO Interconnection Queue (active, SP MW)","source_url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx","top_subregions":null,"v":"published"}],"data_center_load":{"note":"Figures cover the full generation interconnection queue. The ISO public queues (ERCOT GIS / PJM NSQ / MISO GI / SPP / CAISO / NYISO / ISO-NE) are generation-side and do not classify queued load as data-center, so per-ISO data-center load is not derivable from these feeds and is reported as null rather than 0.","tracked":false},"dchub_classified":{"by_iso":{},"method":"Conservative classifier over the tracked per-project queue rows: fuel_type=Load OR DC name-match (data center/hyperscale/colocation/compute campus). Independent of, and comparable to, ISO-published large-load totals."},"freshness":{"fresh_iso_count":10,"latest_as_of":"2026-08-16","note":"Per-ISO as_of is in by_iso; 'fresh' = refreshed on the latest daily ingest.","stale_iso_count":0},"generated_at":"2026-08-16T15:48:14.391459+00:00","iso_count":10,"methodology":"DCPI maps ISO queue position + load growth vs signed contracts -> Excess Power / Constraint scoring. Per-ISO BUILD/CAUTION/AVOID verdicts at https://dchub.cloud/dcpi.","projects":{"by_iso_count":{"CAISO":279,"ERCOT":1893,"ISO-NE":68,"MISO":1092,"NYISO":175,"PJM":972,"SPP":1016},"note":"Named per-project queue rows (project, MW, status, state/county) from the 7 US ISO public queues. Aggregate GW totals are in by_iso; call /api/v1/interconnection-queue/by-iso?iso=ERCOT for the full per-ISO project list.","top":[{"capacity_mw":3200.0,"county":"LA PAZ","fuel_type":"Battery","iso":"CAISO","project_name":"ATLAS COMPLEX","queue_date":"2017-05-01","queue_id":"CAISO-1402","queue_status":"active","state":"AZ"},{"capacity_mw":2709.8,"county":"York","fuel_type":"Nuclear","iso":"PJM","project_name":"Peach Bottom Units #2 & #3","queue_date":"2016-04-29","queue_id":"PJM-AB2-175","queue_status":"Partially in Service - Under Construction","state":"PA"},{"capacity_mw":2650.8,"county":"Salem","fuel_type":"Nuclear","iso":"PJM","project_name":null,"queue_date":"2025-04-09","queue_id":"PJM-AH1-710 - moved to TC2","queue_status":"Active","state":"NJ"},{"capacity_mw":2584.0,"county":"Will","fuel_type":"Nuclear","iso":"PJM","project_name":null,"queue_date":"2025-04-08","queue_id":"PJM-AH1-698 - moved to TC2","queue_status":"Active","state":"IL"},{"capacity_mw":2530.0,"county":"Ogle","fuel_type":"Nuclear","iso":"PJM","project_name":null,"queue_date":"2025-04-07","queue_id":"PJM-AH1-702 - moved to TC2","queue_status":"Active","state":"IL"},{"capacity_mw":2220.0,"county":"St. Charles","fuel_type":null,"iso":"MISO","project_name":"AMEREN MISSOURI","queue_date":"2030-12-01","queue_id":"MISO-J4241","queue_status":"active","state":null},{"capacity_mw":2220.0,"county":"St. Charles","fuel_type":"Gas","iso":"MISO","project_name":"AMEREN MISSOURI","queue_date":"2030-01-01","queue_id":"MISO-J3996","queue_status":"active","state":"MO"},{"capacity_mw":2100.0,"county":"Doddridge","fuel_type":"Natural Gas","iso":"PJM","project_name":null,"queue_date":"2021-03-31","queue_id":"PJM-AG2-582 - moved to TC2","queue_status":"Active","state":"WV"},{"capacity_mw":2000.0,"county":"LA PAZ","fuel_type":"Solar","iso":"CAISO","project_name":"JOVE SOLAR","queue_date":"2021-04-15","queue_id":"CAISO-2023","queue_status":"active","state":"AZ"},{"capacity_mw":1981.2,"county":"Leon","fuel_type":"GAS","iso":"ERCOT","project_name":"BM Great Rock Energy Center","queue_date":"2029-05-15","queue_id":"ERCOT-30INR0091","queue_status":"active","state":"TX"}],"total":5495,"tracked":true},"provenance":{"as_of":"2026-08-16","cite_as":"DC Hub, dchub.cloud","default_v":"published","fallback_url":"https://dchub.cloud","license":"CC-BY-4.0","method":"published ISO queue disclosures, ingested per-ISO; per-record v: published = the ISO's own figure, inferred = DC Hub derivation","provenance_version":1,"source":"US ISO public interconnection queues (ERCOT GIS / PJM NSQ / MISO GI / SPP / CAISO / NYISO / ISO-NE)"},"source":"https://dchub.cloud/interconnection-queues","totals":{"dc_share_pct":17.4,"dchub_classified_dc_gw":null,"queued_load_data_center_gw":307.5,"queued_load_gw":1765.9}}