Gyro Center is a data center in Amsterdam, NL, NL. The facility is currently operational. It sits in the Amsterdam data-center market on the ENTSOE-NL grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 120.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Amsterdam — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Amsterdam — the market this facility sits in (full deep-dive →).
Amsterdam operates 228 tracked facilities totaling 1,061 MW of capacity, anchored by three dominant operators—Digital Realty 20 facilities, Equinix 22 facilities, and an unnamed top operator controlling 35 sites. The market exhibits structural imbalance: excess-power capacity scores 21/100, indicating severe oversupply relative to demand absorption, while infrastructure constraints register at 76/100, reflecting acute physical or network bottlenecks that limit expansion potential. This combination creates a market caught between too much dark capacity and too little room to deploy it productively. For acquisition-focused investors, the DCPI verdict of AVOID is unambiguous and rooted in fundamentals, not cyclical sentiment. The excess-power reading signals that existing operators cannot reliably fill incremental capacity at economically viable utilization rates—a headwind that renders…
Published DC Hub data for this location.
Comparable facilities in Amsterdam tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="gyro-center-gyro-center-2599f0be" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=gyro-center-gyro-center-2599f0be