Novva West Jordan Campus Phase 1 is a data center operated by Novva Data Centers in West Jordan, UT, US. It carries a reported power capacity of 175.0 MW and is currently operational. It sits in the West Jordan data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for West Jordan — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on West Jordan — the market this facility sits in (full deep-dive →).
West Jordan's data center market comprises 325 MW across six tracked facilities, anchored by dual presences from both Aligned Data Centers and Flexential. The market shows moderate fragmentation, with Aligned and Flexential together operating four of the six sites, while Novva Data Centers and Flexential Corp. each operate one facility. Current power availability remains constrained relative to supply potential, creating a mixed operational environment. The DCPI verdict of CAUTION—with excess-power scoring 53/100 and constraint at 48/100—signals neither surplus capacity nor acute scarcity. For acquisition-focused investors, this split reading suggests defensive positioning over opportunistic deployment. The excess-power score above midline indicates modest available capacity headroom, but the constraint score below midline reflects real limitations on simultaneous expansion across all…
Published DC Hub data for this location.
Comparable facilities in West Jordan tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3