Tallgrass Marble DC is a data center operated by Tallgrass Energy in Marble, NC, US. It carries a reported power capacity of 65.0 MW and is currently operational. It sits in the Asheville data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.1-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Asheville — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Asheville — the market this facility sits in (full deep-dive →).
Asheville's data center footprint remains minimal, with only 3 tracked facilities totaling 9 MW across a fragmented operator base. The market is dominated by three single-facility operators—DartPoints LLC, ERC Broadband, and Netriplex—none of which control meaningful scale or consolidation leverage. No recent M&A activity has been recorded, and the total installed base reflects a market that has failed to attract institutional capital or multi-site operators. This atomization is not a sign of healthy competition; it reflects investor reluctance and structural headwinds that have prevented regional consolidation. The DCPI verdict of AVOID is unambiguous for acquisition-focused investors. With an excess-power score of 35/100 and a constraint score of 29/100, Asheville presents a double bind: insufficient power availability to support growth, combined with moderate-to-severe operational…
Published DC Hub data for this location.
Comparable facilities in Marble tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="tallgrass-energy-tallgrass-marble-dc-76f7c7bc" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=tallgrass-energy-tallgrass-marble-dc-76f7c7bc