Unisys Eagan Data Center is a data center in Minneapolis, US. The facility is currently announced. It sits in the Minneapolis data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 21.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Minneapolis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Minneapolis — the market this facility sits in (full deep-dive →).
Minneapolis operates 173 MW across 56 tracked facilities with a fragmented operator base, but faces a structural supply-demand imbalance that warrants caution. Cologix dominates with 12 MW across three entities Cologix Inc., Cologix, and Cologix Min, followed by DataBank's 6 MW, positioning the market as operator-competitive but capacity-constrained. The market's DCPI verdict reflects this tension: an excess-power score of 51/100 paired with a constraint score of 47/100 signals neither surplus nor acute scarcity, but rather fragile equilibrium masking underlying infrastructure friction. For acquisition-focused investors, the CAUTION verdict merits literal interpretation. The constraint score of 47/100—hovering below the midpoint—indicates that power delivery, interconnect capacity, or cooling infrastructure already limits profitable expansion at existing facilities. Buyers acquiring…
Published DC Hub data for this location.
Comparable facilities in Minneapolis tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="unisys-eagan-data-center-30644257" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=unisys-eagan-data-center-30644257