Element Critical CH2

Element Critical

Element Critical CH2 is a data center operated by Element Critical in Wood Dale, IL, US. It carries a reported power capacity of 5.0 MW and is currently operational. It sits in the Wood Dale data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 42.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
5.0 MW
Status
Operational
Market
Wood Dale
State
IL
Country
US
Coordinates
41.9742, -87.9672

Market intelligence

AVOID

Data Center Power Index verdict for Wood Dale — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Wood Dale — the market this facility sits in (full deep-dive →).

Wood Dale's data center market comprises 11 MW across six tracked facilities, dominated by Element Critical's dual presence with four total properties between Element Critical and Element Critical, LLC. The market's DCPI rating of 44/100 for excess power paired with a 56/100 constraint score reflects structural tightness: power availability remains the binding constraint rather than physical space. This positioning places Wood Dale in a materially different situation than broader Chicago, which shares similar constraint pressures but operates at significantly larger scale. For acquisition-focused investors, the AVOID verdict signals poor entry conditions. A constraint score of 56/100 indicates meaningful friction on capacity expansion—whether through retrofitting existing facilities or greenfield deployment. The excess-power rating of 44/100 suggests that available electrical supply…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketWood Dale
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power42.2 months
LocationWood Dale, US
Reported capacity5.0 MW

Other data centers nearby

Comparable facilities in Wood Dale tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 18,000+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="element-critical-element-critical-ch2-3cb7554e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=element-critical-element-critical-ch2-3cb7554e