T5@Augusta is a data center operated by T5 Data Centers in Augusta, GA, US. It carries a reported power capacity of 40.0 MW and is currently operational. It sits in the Social Circle data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 29.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Social Circle — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Social Circle — the market this facility sits in (full deep-dive →).
Social Circle is a constrained, undersupplied micro-market with just 80 MW of operational capacity across three tracked facilities, both limiting near-term acquisition targets and signaling structural power constraints. Meta operates two of these three sites, establishing dominant operator control, while the broader market shows zero recent M&A activity—a telling indicator of limited liquidity and deal velocity in this geography. The DCPI verdict of AVOID carries explicit implications for acquisition-focused investors: the excess-power score of 35/100 reflects acute undersupply, meaning existing operational facilities face persistent demand pressure and command premium valuations that compress entry margins. Simultaneously, the constraint score of 48/100 signals meaningful infrastructure bottlenecks—whether interconnection capacity, transmission headroom, or cooling limitations—that…
Published DC Hub data for this location.
Comparable facilities in Augusta tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="t5-data-centers-t5augusta-67ed7828" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=t5-data-centers-t5augusta-67ed7828